Compasses Bridge
April 2015 - October 2015
Restoration Page
Compasses Bridge
Compasses Oct 2015 - Feb 2016
deck
A view of the reinforced and partially shuttered decking, looking south towards the Compasses pub, just visible in the background. (Oct 11, 2015.) (Photo: Dave Verrall)
deck
Looking west, the reinforcing cage for the bridge decking. Shuttering has been installed for the bridge sides (foreground left and background. The shuttering remains to be done for the sides, although the supports for the shuttering are in place. (Oct 11, 2015.) (Photo: Dave Verrall)
deck
Reinforcing installed for the bridge decking. View looking north towards the Dunsfold airfield entrance. (Oct 11, 2015.) (Photo: Dave Verrall)
abutments
Looking south, with the Compasses pub in the background upper left. The present causeway is on the left. The two abutments are now at the same stage of construction. (Sep 20, 2015.) (Photo: Roger Beazer)
abutments
Looking north towards Dunsfold airfield gatehouse, with the existing WW2 causeway on the right. The abutment wall in the foreground awaits further shuttering for the next stage. Note the advanced state of the wing walls, left and right. (Sep 13, 2015.) (Photo: Dave Verrall)
abutments
View from the canal bed looking east. The left hand, north abutment wall is shuttered and the concrete has been poured. The abutment on the right, south side, awaits shuttering for the next stage. (Sep 13, 2015.) (Photo: Dave Verrall)
abutments
A close-up of the northern abutment wall shuttered ready for second stage concrete pour to bring it to final level. View looking south, Compasses pub visible top left. (Sep 13, 2015.) (Photo: Dave Verrall)
abutments
The north abutment wall shuttered ready for the second stage concrete pour which will bring it up to final height. View looking south towards the Compasses pub, visible top right of picture. (Sep 13, 2015.) (Photo: Dave Verrall)
pile capping
(Aug 11, 2015.) (Photo: Julian Morgan)
pile capping
(Aug 11, 2015.) (Photo: Julian Morgan)
pile capping
(Aug 11, 2015.) (Photo: Julian Morgan)
pile capping
(Aug 11, 2015.) (Photo: Julian Morgan)
piles exposed
The tops of the exposed piles. The concrete is broken away to expose the re-inforcing cage which will be attached to a horizontal mesh which will form the pile capping and to vertical re-inforcing which will form the abutments of the new bridge. View looking north east towards the airfield entrance. The concrete causeway which the bridge will replace is on the right. (Jul 30, 2015.) (Photo: Julian Morgan)
piling base
The piling has been completed and are buried under the infilled base. The excavator is starting to remove the infill which will expose the concrete piles. (Jul 23, 2015.) (Photo: Sally Schupke)
piling base
The piling rig standing on the infilled base from which it operates. The auger drills holes and as it is withdraw concrete is pumped through the auger. A steel re-inforcing cage is then lower into the concrete. The pins with yellow protectors on the tops mark the positions of the piles. (Jun, 2015.)
haul road
The haul road under construction parallel with and to the east of the site of the new bridge. View looking south east. (Apr. 18, 2015.) (Photo: Richard Crook)
haul road
The haul road under construction parallel with and to the west of the site of the new bridge. The bed of the canal, not visible, is in the foreground. View looking north west. (Apr. 18, 2015.) (Photo: Richard Crook)
interp board
Interpretation board at the site of Compasses Bridge. (Click on image to enlarge) (Apr. 18, 2015.) (Photo: Richard Crook)
bridge elevation
Elevation drawing of the new Compasses Bridge.
causeway
The north east side of the compasses causeway before bridge construction, with the secure entrance to Dunsfold Park visible on the right. (Apr, 2011.) (Photo: )
causeway
The south west side of the causeway before work started on the bridge. The entrance to Dunsfold Park is on the left of the picture. (Apr, 2011.) (Photo: )