Loxwood Bridge Construction - 8

IMPORTANT.

C J Thorne Co Ltd., the constructor of the Loxwood Bridge, has now completed the project and left the site. The area remains a construction site and for this reason the public is not allowed on the site at any time. Burras, the piling contractor is now on site and will start piling on Monday Sep. 29, 2008.

bridge west side
Sep. 25, 2008 - The work area for piling the north side of the channel between the bridge and the lock. The brick hardcore is to make a stable base for the piling auger. This is particularly important because of the proximity to the overhead power lines. Picture taken from the horse bridge at the tail of the lock, looking east.
(Photo: Richard Crook)

bridge west side
Sep. 25, 2008 - The west side of the bridge. View looking east. The brick hardcore is to provide a firm base for the piling auger - see above.
(Photo: Richard Crook)

bridge west side
Sep. 25, 2008 - A general view of the completed west side of the bridge. View looking east.
(Photo: Richard Crook)

bridge west side
Sep. 14, 2008 - A general view of the completed west side of the bridge. View looking north.
(Photo: Andy Keene)

bridge west side
Sep. 14, 2008 - The railings fitted to the west side of the bridge. The railings are high to prevent horseback riders and horses from falling into the canal. The canal towpath is a public bridleway, but riders and horses have to cross the B2133 at road level rather than using the path under the bridge.
(Photo: Andy Keene)

bridge west side
Sep. 14, 2008 - The completed west side of the bridge with railings fitted on the towpath side. The concrete piles right of centre will form part of the retaining wall between the bridge and Loxwood New Lock.
(Photo: Andy Keene)

bridge railings
Aug 28, 2008 - The railings fitted to the east side of the bridge.
(Photo: Richard Emsley)

towpath reinforcing
Aug 17, 2008 - Looking west towards Loxwood New Lock, the reinforcing is in place for the towpath ramp as it emerges from the bridge.
(Photo: Richard Emsley)

view of south west wall
Aug 17, 2008 - Looking east, the invert has been cast and the towpath ramp is under construction.
(Photo: Richard Emsley)

bridge view
Aug 17, 2008 - The temporary footbridge has been removed to enable an unrestricted view of the east side of the bridge, photographed from the north side of the Onslow pound.
(Photo: Richard Emsley)

panoramic bridge view
Aug 8, 2008 - A composite picture of the towpath under the eastern side of the bridge. The invert (concrete base under the bridge) has been cast on the western side but is not visible in this picture.
(Photo: Richard Emsley)

opened road
Aug 8, 2008 - Loxwood High Street looking south with the chicanes removed but the road under traffic light control.
(Photo: Richard Emsley)XX