Southland-Lock-4
lock chamber
The near side, towpath side, of the lock being clad with bricks. (April 15, 2012.) (Photo: Richard Crook)
lock chamber
Brickwork in the centre section of the off side wall. (April 15, 2012.) (Photo: Richard Crook)
lock chamber
Formwork for the copings being constructed on the off side tail of the lock. (April 15, 2012.) (Photo: Richard Crook)
lock chamber
The concrete nearside upper cill wall has been cast and the shuttering removed. The aperture on the left is the ground paddle sluice and the aperture on the right is the back pump outflow. The void behind the wall is being filled with clay. (March 18, 2012.) (Photo: Richard Crook)
lock chamber
The brickwork approaches the top along the central section offside chamber wall. (March 18, 2012.) (Photo: Richard Crook)
lock chamber
The brickwork makes good progress on the offside chamber wall downstream of the quoin. (March 18, 2012.) (Photo: Richard Crook)
lock chamber
The offside chamber wall downstream from the quoin, black object on the left. (March 1, 2012.) (Photo: Richard Crook)
lock chamber
Shuttering the nearside cill wall. This has eached the top of the paddle culvert, which is covered with concrete slabs. (March 1, 2012.) (Photo: Richard Crook)
lock chamber
The bow wall at the head of the lock has almost reached its final height on the offside. (March 1, 2012.) (Photo: Richard Crook)
lock chamber
Tail of the lock looking north. The back-pump chamber is on the left. (March 1, 2012.) (Photo: Richard Crook)
lock chamber
Another ie of the back-pump chamber. Note the stop plank channel, black 'U' girder. (March 1, 2012.) (Photo: Richard Crook)
lock chamber
The nearside upper cill wall shuttering. (March 1, 2012.) (Photo: Richard Crook)
lock chamber
Looking south along the lock. The brickwork has reached about half height between the lock ladder channels. (March 1, 2012.) (Photo: Richard Crook)
lock chamber
The bricking at full height for about a third of the lenght of the lock. (March 1, 2012.) (Photo: Richard Crook)
lock chamber
Lower offside wing wall. the space between the blocks and the piling will be filled with concrete. (March 1, 2012.) (Photo: Richard Crook)
lock chamber
The brickwork has now reached the top. (Feb. 19, 2012.) (Photo: Eric Walker)
lock chamber
Formwork nearing completion for the near side upper cill wall. (Feb. 2, 2012.) (Photo: Richard Crook)
lock chamber
Concreting completed on the off side for the ground paddle and upper gate recess. (Feb. 2, 2012.) (Photo: Richard Crook)
lock chamber
The offside lower gate recess with the brick wprk now within 2 courses of the coping stones. (Feb. 2, 2012.) (Photo: Richard Crook)
lock chamber
The brickwork cladding at the tail of the lock. Lower left, the start of the back pump chamber. (Feb. 2, 2012.) (Photo: Richard Crook)