The reinforcing matting delivered ready to be placed before concreting. (Jan 28, 2017.) (Photo:Peter Jewell

slipway
Crushed masonry dumped, spread and rolled on the barrier sheet. The workgroup was led by Rob Nicholson. (July 14, 2016.) (Photo:Peter Jewell

slipway
The plastic barrier sheet (geomat) being laid. The workgroup was led by Rob Nicholson. (July 14, 2016.) (Photo:Peter Jewell

slipway
A view in the opposite direction with the canal on the right. The workgroup was led by Rob Nicholson. (July 13, 2016.) (Photo: Julian Morgan

slipway
The canal can be seen in the left of the picture. The slipway is to be known as the Sydney Thriscutt slipway. (July 13, 2016.) (Photo: Julian Morgan

slipway
During the second week of the WACT 2016 Summer Work Camp, excavation for a slipway near Compasses Bridge was carried out. In this picture the canal is just beyond the marker post in the centre. (July 13, 2016.) (Photo: Julian Morgan